详细介绍
LPG TANK
Technical Parameter of Tank Container
20ft ISO-LPG TANK CONTAINER |
||||
Items |
data |
Items |
data |
|
Tank |
Filling medium |
LPG |
Tank mass |
6000kg |
fact cubage |
22M3 |
Payload |
28000kg |
|
Design pressure |
1.77MPa |
External Dimensions |
6100*2438*2591mm |
|
Thickness of tank |
14mm |
|||
Thickness of cover |
14mm |
Install coefficient |
0.42 |
|
Tank material |
Q345DR |
water Hydraulic test pressure |
2.21MPa |
|
Corrosion allowance |
1mm |
Pressure of leak test |
1.77MPa |
|
treatment type |
Wholly get rid of tress |
Medium density |
448.4(kg/m3) |
Chapter 22 000 lts to be provided in accordance with the following description:
1 - APPROVALS:
• ADR/RID/IMDG/CCS/M.M.F./P.D.5500
• ISO
• Inspection by competent inspection entity
2 - CHARACTERISTICS STRUCTURE:
• Main dimensions: (LxWxH) 20'x2438x2620
• Structure built in high quality steel ST42 or equivalent
• Tare weight 6,000 lbs
• Maximum gross weight of 28,000 lbs
• Corners fixing: 8
3 - RESERVOIR:
The tanks will be constructed of steel sheet of fine grain type P 460 NL1 or equivalent
main dimensions
• Capacity: 22,000 lts
• outer diameter: 2250 mm
technical
• Code of calculation, construction and testing: PD 5.500/IMDG/ADR
• Working pressure: 18 bar
• Test pressure: 25 bar
• Temperature calculation: - 20 C to +50 C
• Thickness of the ferrules: 10 mm ~14mm
• Thickness of funds: 10 mm ~14mm
• 100% X-ray welds ace
• No final heat treatment
• Thermal protection (sun shade)
4 - EQUIPMENT:
• 2 safety valves REGO mod. 8434G
• Level 1 Rochester Magnetel 6339-11
• Pressure gauge 1 "(0-25 bar)
• 1 Thermometer -30 C to +70 C
• Phase 1 Net with bottom valve 3 "and mechanical drive
• 1 Gas Phase with bottom valve 2 "and mechanical drive
• 1 ball valve 3 "for loading / unloading of liquid
• 1 ball valve 2 "for the gas phase
• Accessory Connection 3 "to 3 ACME"
• Accessory Connection 2 "ACME 3 "
• Plate with the registration of all features
• Protective housing for equipment with door opening and closing on two sheets
5 - FINISH:
1. exterior finish
• Pickling
• 1 primer coat must
• 1 Overcoat finish
2. interior finish
• After hydraulic test surfaces and piping are free of dust, oil, paint or
Fats